Embedding Energy Efficiency First in National Energy Planning: Findings from the second Croatian pilot case

The second Croatian pilot case builds directly on the findings of the first ENEFIRST Plus’ Croatian pilot case on transmission grid planning and investment appraisal. This first pilot concluded that the greatest leverage for EE1st lies at the planning and scenario-development stage rather than in the cost-benefit analysis of individual projects.

Building on this finding, the second pilot moves upstream to the National Energy and Climate Plan (NECP) and its interaction with more detailed sectoral planning processes. The NECP provides the overarching national framework for the development of the energy system, setting energy and climate objectives and trajectories and providing key assumptions that are subsequently used in sectoral planning. At the same time, important planning and investment choices are further developed through instruments such as the National Building Renovation Plan (NBRP), the Comprehensive Heating and Cooling (H&C) Assessment and transmission and distribution network development plans. The pilot therefore examines EE1st not within a single investment decision, but across this interconnected planning architecture.

The second Croatian pilot case therefore looks at how comprehensively the principle is applied across the entire planning chain. The analyses investigate not only whether the individual planning processes incorporate EE1st considerations, but also how they are connected. This leads to the central question of the pilot: Can stronger feedback and iteration between national and sectoral planning improve the implementation of EE1st at system level?

Against this background, the pilot case aims to:

  • assess how EE1st is embedded in NECP scenario development and modelling;
  • examine how key NECP assumptions are reflected in the NBRP, Comprehensive H&C Assessment and network development planning;
  • assess whether and how results from these more detailed sectoral planning processes feed back into national energy planning; and
  • identify practical opportunities to strengthen alignment, feedback and iteration across planning processes, without necessarily requiring a single integrated modelling framework.

The pilot shows that implementing EE1st in national energy planning is not primarily a question of introducing additional analytical tools. A key lesson is that alignment is necessary, but not sufficient. Sectoral plans being consistent with the NECP ensures a common direction but does not test whether the national pathway remains optimal once more detailed analysis becomes available.

This suggests that a practical application of EE1st at national-planning level can be understood as optimisation through iteration. Such iteration should be targeted rather than exhaustive: feedback is particularly relevant where sectoral or system analysis identifies consequences capable of changing the preferred national pathway.

The pilot also shows, however, that effective iteration depends on more than analytical compatibility. Timing and governance matter. The NECP, NBRP, H&C Assessment and network plans follow different regulatory and preparation cycles and may be commissioned separately, sometimes by different authorities or operators. In practice, interdisciplinary expert cooperation can partly bridge these gaps through exchange of assumptions and identification of inconsistencies across planning exercises. However, informal coordination cannot substitute for an organised and continuous planning process. Making EE1st operational therefore requires aligning planning calendars where possible and, more importantly, defining specific feedback points at which assumptions and material results are exchanged between planning processes.

More fundamentally, these findings point to the need to make the energy policy cycle itself genuinely continuous and operational. Rather than treating planning documents as exercises prepared at fixed points in time, implementation and monitoring should continuously inform assessment, feedback and, where material deviations or new evidence emerge, corrective action and refinement of the national pathway.